GBIG.org will be retired on March 31, 2026. Please ensure you have saved any materials you wish to retain before that date. Questions? Contact us

8

Building

Building 8

Jalan Hi-tech 2/3, Kulim Hi-tech Park, Kulim, Kedah, Malaysia

Intel Malaysia KM2 Building

Details

Icon-transparency Transparency

This building has a 2 year timeline with 2 green activities including a LEED Silver certification.

Timeline

Intel Malaysia KM2 Building
awarded on 10/03/2011
Silver
LEED EB 2009
Intel Malaysia KM2 Building
registered on 07/29/2010
Registered
LEED EB 2009

Resources

Building Details

Owner Type(s) Corporate: Publicly Traded
Space Type(s) Industrial Manufacturing
Report a Data Problem