Akacjowa 11/13

Building

Building Akacjowa 11/13

Psary, Poland

FM Logistic Bedzin Stage 1, FM Logistic Bedzin Stage 2, FM Logistic Bedzin Stage 3

Details

Icon-transparency Transparency

This building has a 7 year timeline with 6 green activities including LEED Gold and Silver certifications.

Timeline

FM Logistic Bedzin Stage 3
awarded on 05/05/2022
Gold
LEED v4 BD+C WDC
FM Logistic Bedzin Stage 2
awarded on 05/13/2021
Silver
LEED v4 BD+C WDC
FM Logistic Bedzin Stage 3
registered on 11/23/2020
Registered
LEED v4 BD+C WDC
FM Logistic Bedzin Stage 1
awarded on 07/01/2020
Silver
LEED v4 BD+C WDC
FM Logistic Bedzin Stage 2
registered on 09/01/2019
Registered
LEED v4 BD+C WDC
FM Logistic Bedzin Stage 1
registered on 03/14/2016
Registered
LEED v4 BD+C WDC

Walk Score®: 19/100

Resources

Building Details

Space Type(s) Warehouse and Distribution
Report a Data Problem