3-4 Southampton Pl

Building

Building 3-4 Southampton Pl

Holborn, London, UK

Floors611ThePostBuilding

Details

Icon-transparency Transparency

This building has a 7 year timeline with 2 green activities including a LEED Gold certification.

Timeline

Floors611ThePostBuilding
awarded on 10/26/2023
Gold
LEED v4 ID+C CI
Floors611ThePostBuilding
registered on 09/29/2017
Registered
LEED v4 ID+C CI

Walk Score®: 100/100

Resources

Building Details

Owner Type(s) Corporate: Privately Held
Space Type(s) Office
Report a Data Problem